Lead Time Calculation is incorrect in Unconstrained ASCP and MRP
(Doc ID 557200.1)
Last updated on SEPTEMBER 11, 2023
Applies to:
Oracle Materials Requirement Planning - Version 11.5.2 and laterOracle Advanced Supply Chain Planning - Version 11.5.2 and later
Information in this document applies to any platform.
ASCP Unconstrained Planning , MRP
Symptoms
Dates calculated by Unconstrained ASCP or MRP are not considered by WIP Mass load.
There is a discrepancy in the dates calculated between plan and discrete jobs released from the plan.
The Plan has calculated one date but WIP Mass Load is picking up the data from routing directly and calculates the start date.
This may cause confusion if the expectation is that it should consider the lead time passed by the planning which matches the item attributes.