How to Change the Capex Cost Uncertainty to Something Other Than Uniform, Triangular, Beta Pert, or Single Point. (Doc ID 910532.1)

Last updated on JUNE 30, 2016

Applies to:

Primavera Risk Analysis - Version 8.0 to 8.6.0018 [Release 8.0 to 8.6]
All Platforms
***Checked for relevance on 6-March-2013***

Goal

Change the Capex Cost uncertainty to something other than uniform, triangular, beta pert, or single point.

Solution