FAQ - DBHome size reduction due to overprovisioning issue (Doc ID 2695218.1)

Last updated on SEPTEMBER 24, 2020

Applies to:

Oracle Cloud at Customer - Version N/A to N/A
Information in this document applies to any platform.

Purpose

Oracle Documentation describes that the max configurable DBHome size of all the VM Clusters is 1.1 TB on each DOM0
https://docs.oracle.com/en/cloud/cloud-at-customer/exadata-cloud-at-customer/exacc/administer-clusters.html#GUID-5B83F906-0D8A-401A-8E19-46EC45C92B07

Above DOC lacks details on how this max DBhome size gets affected based on how many clusters are configured, because as the number of clusters or VMs on each DOM0 increases, it affects the space used by u01 and Grid Infrastructure on DOM0 and in turn has direct impact on the 1.1TB max usable value . This MOS note is to provide additional details about it.

Below document share more detail information about the DBHome size and recommended values based on number of VM cluster -
ExaCC Gen 1: Available space for 'DB Home Storage' (Doc ID 2695096.1)

Questions and Answers

To view full details, sign in with your My Oracle Support account.

Don't have a My Oracle Support account? Click to get started!


In this Document
Purpose
Questions and Answers
 Does oracle take DOMU backups? and how does the max 1.1TB for /u02 impact the remote backup?
 How will this over provisioning situation be addressed?
 Does this activity needs downtime ?
 What need to be consider while deciding on the u02 size.
 customer has already configured the 8 VM Clusters or they have planned to configure 8 VM cluster. What will be DBHome recommendations for them?
 Can the Remote backup configured to dump backup on some other location like control Plane or othe Block storage?
 Recommended location to keep Database trace files/pdb file?
 Calculation for the u02 size in dom-U
 Do we have to give same DBHome size to each of the VM Cluster
 If the VM get corrupted or deleting during the activity.
 Post activity of reducing u02, what will be the status of backup.
 How many clusters customer can schedule to reduce u02 in a single window. 
 In case of Full Rack, if all 8 VMs cannot be done in the single Window, Customer can choose the DBnoeds on which he want to reduce U02 first
 How much time it will take to complete the DBHome reduciton for 1 VM including the DB restart. 
 Who will perform the resize operaiton? Privileges required to re-size dom-U inside customer VM. Steps/command need to be shared for this activity
 Broader steps performed by customer during this activity