PO Is Set Up As Inspection Required But When Item Is Received It Is Changed To Standard Receipt (Doc ID 1391491.1)

Last updated on JUNE 06, 2016

Applies to:

Oracle Quality - Version 11.5.10.2 and later
Information in this document applies to any platform.
***Checked for relevance on 07-Jun-2013***

Goal

Items are set up with the Receipt Routing of Inspection.
The PO is set up at shipment level with the receipt routing of Inspection Required but while receiving the routing method is automatically changing to Standard receipt

Expecting to see the routing method as Inspection Required.

Steps to reproduce:
1. Create Item with Receipt Routing = Inspection Required
2. Purchase Orders > Purchase Orders > Create standard Purchase Order for inspection required item
3. At shipment level, Receiving Controls > Receipt Routing = Inspection Required
4. Receiving > Receipts RCVRCERC form >At the time of receipt Status is Inspection Required
5. See one line with Destination type Receiving for the Item
6. After saving the routing is changed to Standard Receipt

The trace from RCVRCERC form shows the last instruction is

INSERT INTO QA_SKIPLOT_RCV_RESULTS( INSP_LOT_ID, CRITERIA_ID, PROCESS_ID,
INTERFACE_TXN_ID, SHIPMENT_LINE_ID, RECEIPT_DATE, MANUFACTURER_ID, LPN_ID,
SOURCE_INSPECTED, LOT_QTY, TRANSACTED_QTY, INSPECTION_STATUS,
INSPECTION_RESULT, LAST_INSP_DATE, VALID_FLAG, LAST_UPDATE_DATE,
LAST_UPDATED_BY, CREATION_DATE, CREATED_BY, LAST_UPDATE_LOGIN)
VALUES
( :B10 , :B9 , :B8 , :B7 , NULL, :B6 , :B5 , :B4 , DECODE(:B3 , 1, 'Y', 'N'),
:B2 , 0, :B1 , NULL, NULL, 1, SYSDATE, FND_GLOBAL.USER_ID, SYSDATE,
FND_GLOBAL.USER_ID, FND_GLOBAL.LOGIN_ID)

A record can be found in QA_SKIPLOT_RCV_RESULTS table for the related SHIPMENT_LINE_ID
with INSPECTION_STATUS  = SKIPPED

Solution

Sign In with your My Oracle Support account

Don't have a My Oracle Support account? Click to get started

My Oracle Support provides customers with access to over a
Million Knowledge Articles and hundreds of Community platforms