Oracle Allows To Skip OSP Operation Even If OSP Shop Floor Status Assigned In WIP Parameter

(Doc ID 2015216.1)

Last updated on MARCH 08, 2017

Applies to:

Oracle Work in Process - Version 12.1.3 and later
Information in this document applies to any platform.

Goal

In current design even if shop floor status is assigned to OSP operations in WIP parameter you can skip over OSP operation as system allows moving the job from previous operation (to OSP) to next operation of OSP

How come Oracle allows user to skip OSP operation even if OSP Shop floor status is assigned in WIP parameter?
 

Solution