Wip Mass Load Fails With 'Error!'
(Doc ID 2160662.1)
Last updated on JULY 15, 2024
Applies to:
Oracle Work in Process - Version 12.1.3 to 12.1.3.3 [Release 12.1]Information in this document applies to any platform.
Symptoms
After RPC4 (Patch 21236633) installation, when attempting to create a job number with a phantom component and the job number is associated with a project and task, the WIP Mass Load does not update the component supply type for the phantom component and the following error occurs:
ERROR
Error!
STEPS
The issue can be reproduced at will with the following steps:
1. Navigation = Bills-> Bills -> Query a problem assembly
2. The item Sequence 10 and 15 at operation 1 contains a Phantom Items at the 1 level of the BOM
3. Components at the 2 level of the BOM have a Supply Type of push
4. For a discrete job created from the above BOM, we need to change the supply type of the children of phantom item at level 1 from push to BULK
5. Create a discrete job. Responsibility = Work In Process (WIP)
Navigation = Discrete-> Discrete
6. Create a job with a Project/Task for the assembly from 2 and run the Mass Load with parameters to change the supply type.
7. The WIP mass load finishes with a warning (warning message validation error happen) and the supply type is not updated.
Changes
Applied Patch 21236633
Cause
To view full details, sign in with your My Oracle Support account. |
|
Don't have a My Oracle Support account? Click to get started! |
In this Document
Symptoms |
Changes |
Cause |
Solution |
References |