When job is attempted to create through MRP Workbench (WIP Mass Load), the following error occurs.

ORA-01841: (full) year must be between -4713 and +9999, and not be 0 in Package wip_infResSched_grp Procedure backwardSchResource

The issue can be reproduced at will with the following steps:

  1. MRP- Go to Planners Workbench
  2. Release the Planned work order.
  3. See that WIP Mass Load failed and above error message is generated in WIP_INTERFACE_ERRORS.