EKanban Question About How Do Create Four Locations In The Kanban?

(Doc ID 2312831.1)

Last updated on OCTOBER 01, 2017

Applies to:

Oracle Flow Manufacturing - Version 12.2.5 and later
Information in this document applies to any platform.

Goal

User is implementing eKanban and have a question on how to split demand by shop floor locations.

Use's shop floor is not locator controlled in inventory but physically there are 3-4 locations where component is needed for the same assembly. If they have total demand for the assembly, such as 1000 and have 4 locations on the shop floor where each location needs 25% of the demand how do they create these 4 locations in the kanban ?
 

Solution