Goal

Is there a way to get the top level cost to reflect both the larger lot sizes for the top level?

Problem Description
---------------------------------------------------
The cost rollup does seem to correctly change the values based on the lot size for the top level item, but it doesn’t update the lot sizes for the lower level components. This is where a lot of the cost savings will come from when quoting larger quantities (improved costing on the components). Is there a way to get the top level cost to reflect both the larger lot sizes for the top level item, as well as all of the components which will be going into the assembly?

a. Example… XXX-XXX01-A has 19 items present on the bill of material.
b. I can go through the steps and change the costing lot size for XXX-XXX01-A to be 500… but this only reduces the cost about a dollar.
c. How can I see the cost for lot size 500 for XXX-XXX01-A, which also reflects a lot size of 500 for those 19 bill of material components?

Solution

To view full details, sign in with your My Oracle Support account.

Don't have a My Oracle Support account? Click to get started!


My Oracle Support provides customers with access to over a million knowledge articles and a vibrant support community of peers and Oracle experts.