Link Between Lower Level Supply And Sales Order Line Demand
(Doc ID 2585472.1)
Last updated on APRIL 04, 2025
Applies to:
Oracle Work in Process - Version 12.2.5 and laterInformation in this document applies to any platform.
Goal
We are implementing the ATO process for Make items. The top level item is an ATO item with 'Make' type. The sub-assembly that is the Child item in the BOM of the Top level FG is also an ATO item.
'Create Lower Level Supply' in the BOM parameter is setup as 'Auto created Configuration Items and ATO Items'.
Sales order is entered for the Top level FG item. Upon progressing the Order line, system is automatically creating 2 WIP jobs via 'Autocreate FAS' process.
1. WIP job for the top level FG, that is entered on the Sales order line.
2. WIP job for the Sub-assembly, that is the ATO item and setup as a component in the BOM of Top level FG.
The 1st WIP job for the Top level FG is linked to the Sales order line via MTL Reservations.
Does Oracle provide link between the Lower level WIP job with the Sales order line OR Top level WIP job.
Solution
To view full details, sign in with your My Oracle Support account. |
|
Don't have a My Oracle Support account? Click to get started! |
In this Document
Goal |
Solution |
References |