Goal
Resource costing by basis type 'Item' and 'Lot' in the same routing and different operation sequence
Have a Routing where we have two step operation 1 by Item basis, and 2 by Lot basis and requirement is to consider the cost by Item basis
The request is to use resource costs where the basis type is item and operation 100 is needed and used for ATP for machine setup/change over can we ignore this (operation 100) can be ignored for costing.
Solution