My Oracle Support Banner

FAQ Oracle Flow Manufacturing Application For Setup, Sequencing, Workbench, Mix Model Map (Doc ID 396177.1)

Last updated on JANUARY 31, 2022

Applies to:

Oracle Flow Manufacturing - Version 11.5.2 and later
Information in this document applies to any platform.

Purpose

This FAQ was produced to address questions and concerns regarding Oracle Flow Manufacturing Application. The questions in this FAQ are categorized by Flow Manufacturing Topics. This is a live document and is updated as needed. 

Questions and Answers

To view full details, sign in with your My Oracle Support account.

Don't have a My Oracle Support account? Click to get started!


In this Document
Purpose
Questions and Answers
 .
 GENERAL
 Why is it when you check the boxes to Include or Exclude Resource Cost Rollup using the cost rollup window accessed from tools menu it is not saved?
 Why do Flow Schedules with line_id null are not getting purged when running the 'Purge Flow Schedules' program?
 Why in Events from a line operation or process in an option class routing in flow manufacturing are not linked to the corresponding line operation or process in the configuration routing creating by Autocreate Configuration Items?
 .
 FLOW MANUFACTURING SETUP
 How do I Define Product Family Members?
 How do I Setup and Use Flow Sequencing and Execution Workstation?
 How do I Plan by Product Family Assembly or Model?
 .
 FLOW SEQUENCING
 Why does the Flow Sequencing Concurrent Program Causes Message Invalid Build Sequence Range?
 Why when running the Flow Sequencing ( FLMSEQ ) concurrent program it is completing with a warning? When you look in the Task Details under Other Exceptions, it lists the message Invalid Build Sequence Range.
 Why does the system only displays the category codes defined under seeded Inventory category sets and item categories flex structure?
 .
 MIXED MODEL MAP WORKBENCH
 Why do I receive an OG-03101 Oracle Toolkit error when opening the Mixed Model Map?
 Why when performing Operation TAKT calculation is it incorrect where the calculation is performed using both operation and processes?
 .
 FLOW WORKSTATION
 Why in the Flow Workstation form ( WIPPCBFW ), when selecting a line and line operation and attempting to use the <Complete Line Operation> button does the session get disconnected with no error messages?
 
How do you handle operations that have no events in the Flow Execution Workstation?
 .
 Graphical Line Designer
 Why when building the Flow Line using the Graphical line designer, when assigning a resource (3 shift based not 24 hr with UOM = HR) the form issues an error "APP-BOM-20861: Resource is not Time Based. You cannot schedule a resource that is not time based." However the resource IS time based - the base for the HR UOM is TIME.
References

My Oracle Support provides customers with access to over a million knowledge articles and a vibrant support community of peers and Oracle experts.