Bulk Plan Fails to Plan an Order on a Ground Schedule (Doc ID 880883.1)

Last updated on MARCH 08, 2017

Applies to:

Oracle Transportation Operational Planning - Version 5.5.05 to 5.5.05.03 [Release 5.5]
Information in this document applies to any platform.
***Checked for relevance on 22-Sep-2011***


Symptoms

-- Problem Statement:
On 5.5.05, Find that an Order when planned on a Ground Schedule with the Parameter Set to Hold As
Late As Possible to True, the order fails to plan If the order is planned using DEFAULT planning parameter, the Order plans

EXPECTED BEHAVIOR
Expect that the order is planned even if Hold as Late as Possible is turned on

-- Steps To Reproduce:
The issue can be reproduced at will with the following steps:
1. Set up a parameter set with Hold as Late as Possible set to True
2. Then create a Ground Schedule between two locations
3. Create an Order that is planned with this Ground Schedule and Parameter Set, see that the
planning fails


Cause

Sign In with your My Oracle Support account