An asset has an in service date of the 1st July 2017. The asset cost is 4,200 with the asset life as 6 months. The asset was ADDed to the system on January 1st, 2018 at which point the useful life was over. The expectation was that a PDP would have been created for the full cost of the asset. However, there is no PDP. How can this asset be processed such that the expected PDP is created?