Symptoms

The maximum number of concurrent processes for a Process Scheduler server for Process type PSJob is set to 1.

The Application Server and Process Scheduler cache have been cleared.

However more than one PSJob or Scheduled Jobset runs simultaneously.

Why is this so? How can I configure the system to run one PSJob at a time?

Cause