SuperCluster - How to cleanly shutdown and startup an Oracle SuperCluster T4-4 or T5-8
(Doc ID 1487791.1)
Last updated on OCTOBER 09, 2023
Applies to:
Oracle SuperCluster T5-8 Full Rack - Version All Versions to All Versions [Release All Releases]Oracle SuperCluster T5-8 Half Rack - Version All Versions to All Versions [Release All Releases]
SPARC SuperCluster T4-4 Half Rack - Version All Versions to All Versions [Release All Releases]
SPARC SuperCluster T4-4 - Version All Versions to All Versions [Release All Releases]
Oracle Solaris on SPARC (64-bit)
Goal
Describe the recommended procedure for cleanly powering down and powering up an Oracle SuperCluster T4-4 or T5-8.
Solution
To view full details, sign in with your My Oracle Support account. |
|
Don't have a My Oracle Support account? Click to get started! |
In this Document
Goal |
Solution |
Shutdown Procedures |
If running OpsCenter 12C in SuperCluster mode you will have to also halt the enterprise controller so it does not attempt to fail over while bringing down CRS. |
Follow applicable documentation to cleanly shutdown all user applications or databases running in zones or LDoms. |
Obtain a list of all running zones |
Shutdown all running zones |
Obtain a list of all running LDoms |
Obtain the names of the LDoms with direct hardware access. |
Stop the domains from the ldm list command one that are not on this list |
Stop the guest domain with hardware access |
Shutdown the CRS stack on all domains running Oracle CRS. |
Verify all oracle processes are stopped and if they are not remediate as necessary |
Shutdown Exadata storage cell services and operating systems |
Shutdown the operating system of the control LDom |
Connect to the compute node ILOM and stop SYS |
Shutdown the ZFS Storage Appliance |
The switches do not have specific power off instructions they will be powered off when power is removed from the rack. |
Flip the breakers on the PDUs to the off position. |
Startup Procedures |
Flip the breakers on all PDUs to the on position |
Verify and if necessary fix the partitioning on the IB Switches |
Startup the ZFS Storage Appliance |
Verify the startup of the Exadata storage cells |
Bring up the T4-4 or T5-8 systems |
Verify the system |
Restart all applicable applications and test. |