Purpose

This document helps the user to prepare an Infiniband Switch for replacement and collect information required by Oracle Support / On-site team prior to Dispatch of a replacement IB Switch part.

Scope

- The document distribution is EXTERNAL since it needs to be shared with and used by the Customer-admin, as well as referenced by Partners, Field Engineers, and Oracle Support.

- Where Oracle Support has confirmed the need for an IB Switch replacement (whether that replacement will be performed by Customer-admin, Partner or Oracle Field Engineer), Customer-admin is requested to confirm by updating in MOS SR-notes that all the pre-check actions in this document have been completed - by copying/pasting the requested checklist(s) into the SR in MOS - prior to Oracle Dispatching the Part for replacement.

- Oracle Support will not Dispatch until these checks have been performed unless customer has given a clear statement acknowledging the risks of not performing these checks prior to replacement.

Details

To view full details, sign in with your My Oracle Support account.

Don't have a My Oracle Support account? Click to get started!


In this Document
Purpose
Scope
Details
 Note: For IB switches within an exalogic system, use Doc ID 2218443.1 instead of this document
 1. Checks needed prior to Dispatch of Part/Onsite
  1.1. Check the IB Fabric to ensure resilience to later booting (refer to companion KB article)
  1.2  Check/update the configuration backup
  1.3 Check the firmware version of the Switch
  1.4 Check for presence of workaround firewall rule on port 623
 2. Complete the check-list template – IB Switch preparation for Replacement
 3. Provide a report on the replacement pre-checks to Oracle Support including outage type
 4. Final pre-Dispatch preparation (IB Switch replacement in production IB Fabric)
  4.1. Disable SM on the switch being replaced
  4.2. Check if running ASR / block alerts if so
  4.3. Update in MOS that step 4 actions are completed
 5. Contact Oracle Support for Part/Onsite Dispatch
 6. Replace the switch and perform Follow-up actions
References