Active/Cold Replacement of FRU's on M12s Building Block System
(Doc ID 2248503.1)
Last updated on AUGUST 12, 2020
Applies to:
Fujitsu SPARC M12-2S - Version All Versions and laterInformation in this document applies to any platform.
Goal
Active / Cold Swapping FRU's on M12S
Solution
To view full details, sign in with your My Oracle Support account. |
|
Don't have a My Oracle Support account? Click to get started! |
In this Document
Goal |
Solution |
Section 1: Checking the Operation Status and Resource Usage Status of Oracle Solaris |
Section 2: Returning the Mode Switch to Locked Mode |
Section 3: Releasing I/O |
Section 4: Dynamically releasing the SPARC M12-2S requiring maintenance from the physical partition |
Section 5: Releasing the SPARC M12-2S from the Building Block Configuration |
Section 6: Power off the M-12S that requires Service |
Section 7: Incorporating the SPARC M12-2S into a building block configuration |
Section 8: Checking the FRU status After Maintenance |
Section 9: Incorporating the SPARC M12-2S Into the Physical Partition Using PPAR DR |
Section 10: Checking the Operation Status of Physical Partitions and Logical Domains |
Section 11: Returning the Mode Switch to Locked Mode |