Purpose

This document is part of an Information Center - to see other documents related to Shop Floor Control, please use the links provided below:

Information Center: JD Edwards EnterpriseOne Shop Floor Control > Information Center: Using JD Edwards EnterpriseOne Shop Floor Control > Note 1412953.1

This document will answer frequently asked questions regarding commitment processing within the suite of manufacturing applications.

The setup and functionality of Commitment Processing for Manufacturing Applications is explained in Document 1407875.1.

Questions and Answers

To view full details, sign in with your My Oracle Support account.

Don't have a My Oracle Support account? Click to get started!


In this Document
Purpose
Questions and Answers
 Question 1:  Why are Parts List commitments made to only one location, or to the primary location (no inventory), when setup to Split Across Locations?
 Question 2.  Is there a workaround to 'recommit', backordered items, to a location/lot, when they become available, and not requiring deleting the parts first?
 Question 3:  When R31410 is run a second time why are the hard commitments made to the Primary location instead of the locations with available inventory?
 Question 4:  Why is a commitment made to an incorrect lot when B/P Commitment Method = 2- Lowest Lot and Commitment Date Method  = 1 Lot Expiration Date?
 Question 5:  After R3190 is run, why does demand in S&D Inquiry (P4021) not match total quantity Committed (QCOMM) in Summary Availability inquiry (P41202)?
 Question 6:  Can WO Processing (R31410) be setup both Hard committed (items not lot-controlled), and others Soft committed at Work Order print?
 Question 7:  What is the commitment sequence when Commitment Method = 2  Lowest Lot Number and Item lot serial numbers are same in different locations?
 Question 8:  Is there a Business Function where the Availability Calculation is performed so that the same can be used in custom programs?
 Question 9:  How does Commitment Method 2 work with locations and Picking Sequences?
 Question 10.  Can a primary location be changed?
 Question 11: When processing work orders using R31410 and hard committing by lot expiration date, what method is used to select a lot if there are multiple lots with the same expiration date?
 Question 12: Is there a report that will print Parts List and not affect commitments based on the MFG Constants when set as Soft / Hard when printing?
References