E1: 31: Blind Material Issue During WO Completion with Backflush - P31114 / P31113 Performs Unnecessary Checking on Warehouse Open Requests
(Doc ID 3050787.1)
Last updated on OCTOBER 01, 2024
Applies to:
JD Edwards EnterpriseOne Shop Floor Control - Version 9.2 and laterInformation in this document applies to any platform.
Symptoms
In a warehouse managed branch, P31114 - Work With Work Order Completions with Backflush blind material issues checks on non warehouse parts item from a different branch (non warehouse managed).
The issue can be reproduced at will with the following steps:
- Use P4101 and P41026 to create a parent and component_1 in a warehouse managed branch. Create a component_2 in a different non warehouse managed branch.
- In P3002 create a BOM for the parent with the first line having component_1 with issue type code = I and second line component_2 with issue type code = B (non warehouse managed).
- Create a WO for 10 EA of the parent in P48013.
- Attach the parts list to the WO interactively, using P3111 called from P48013. P3111 version is defined with PO settings TAB warehousing, 1. Request Process Mode = 1. Save the WO parts List.
- In P3111 check that the first line for the warehouse managed component_1 has the material status = 07 (in warehouse). Do not process the request in the warehouse applications.
- Do completions with back flush in P31114 with PO tab Edits, Option 1. Backflush = 2 = Perform a blind execution of WO issues. Check the settings for P31114 version in the tab 8 Warehouse Mgt and set the processing option # 1 = Process putaway requests only = 1. Putaway Requests. Perform a partial completion of 2 EA out of the 10 EA. Save the transaction.
- In P31114 re-enquire on the WO and notice the completed quantity is not updated.
Changes
N/A.
Cause
To view full details, sign in with your My Oracle Support account. |
|
Don't have a My Oracle Support account? Click to get started! |
In this Document
Symptoms |
Changes |
Cause |
Solution |
References |