E1: 30: Revision Levels on BOMs vs. ECOs and How ECOs Use Revisions (P3002/P3013)
(Doc ID 646049.1)
Last updated on SEPTEMBER 16, 2024
Applies to:
JD Edwards EnterpriseOne Product Data Management - Version XE and later Information in this document applies to any platform.
Goal
Provides information regarding Engineering Change Orders (ECOs), Bills of Material (BOMs), and Revisions fields.
Here is a specific business case: Adding a BOM through the Enter/Change the Bill of Material (P3002), for a drawing named i.e. "Z2", with a revision of "A". When entering the BOM, no provision is provided to enter the field "BREV". Can the revision "A" be populated into this field, without using an ECO? Tested using an ECO and cannot process it on the same date as entering the BOM.