How To Control Concurrent Execution of ODI Scenarios and Load Plans
(Doc ID 2008628.1)
Last updated on JULY 30, 2024
Applies to:
Oracle Data Integrator - Version 10.1.3.2.0 and laterOracle Data Integrator on Marketplace - Version 12.2.1.4.200123 and later
Information in this document applies to any platform.
Goal
By default, nothing prevents two instances of the same Oracle Data Integrator (ODI) Scenario or Load Plan from running simultaneously.
This situation could occur in several ways. For example:
-
A Scenario is executed, while another instance of the same Scenario is already running... or
-
A Load Plan containing a Run Scenario step is running in two or more LoadPlan active instances simultaneously such that 2 instances of the same Run Scenario step may be executed at the same time
-
etc
Technical constraints require that there must be no overlap of executions, and that one instance of the Scenario / Load Plan execution must determine if another instance is still running or not.
How to set up such an approach?
Solution