The Scheduled Job Opt_FT_IdcText Is Running After Rebuilds
(Doc ID 2269209.1)
Last updated on DECEMBER 18, 2023
Applies to:
Oracle WebCenter Content - Version 11.1.1.8.0 and laterInformation in this document applies to any platform.
Symptoms
The scheduled job Opt_FT_IdcText has been disabled successfully after performing the steps in the following KM:
How can the Webcenter Content Scheduled Job to Optimize the Index be Disabled? (Doc ID 1931507.1)
However, the scheduled job runs during the next hour interval after a fast/full rebuild. As a result, this can cause high DB resource utilization or deadlocks with the external optimization job that has been setup as described in the KM below.
How to Disable Scheduled Job - Opt_FT_IdcText (Causing Deadlocks With Back End Database Optimization Job Configured) (Doc ID 1617419.1)
This issue has been replicated in the following UCM versions:
- 11.1.1.8 with latest bundle patch (MOS Patch 25048862)
- 11.1.1.9 with latest bundle patch (MOS Patch 25973506)
- 12.2.1.2.0
Changes
A fast or full collection rebuild just completed
Cause
To view full details, sign in with your My Oracle Support account. |
|
Don't have a My Oracle Support account? Click to get started! |
In this Document
Symptoms |
Changes |
Cause |
Solution |
References |