Using Mobile Workforce Management Configuration Guide Outline When Sizing and Calculating Minimum Schedulers Required with Maximum Load of L (Doc ID 1334136.1)

Last updated on JANUARY 05, 2017

Applies to:

Oracle Utilities Mobile Workforce Management - Version 2.0.1.1 and later
Information in this document applies to any platform.

Goal

The Mobile Workforce Management Configuration Guide includes the following excerpt:


Using Multiple Schedulers to Scale the Scheduling Process:

Define a variable, L, to be the maximum task load that can be scheduled by a single scheduler. 20,000 is the typical maximum.
...
Though the typical maximum load (L) for a scheduler is about 20,000, schedulers configured with an optimization area should be designed for a smaller average load, typically 62.5% of L, which we call oL.



What is the maximum task load, L, when determining the minimum number of schedulers with the calculation: (Number of tasks / L) * 2?


Solution

Sign In with your My Oracle Support account

Don't have a My Oracle Support account? Click to get started

My Oracle Support provides customers with access to over a
Million Knowledge Articles and hundreds of Community platforms