EBS:PS: FAQ on PS Solver Functionality - Resources (Doc ID 1557119.1)

Last updated on MARCH 11, 2019

Applies to:

Oracle Production Scheduling - Version 12.1.1 and later
Information in this document applies to any platform.

Purpose

This document covers frequently asked questions about the resources functionality in PS.

Questions and Answers

To view full details, sign in with your My Oracle Support account.

Don't have a My Oracle Support account? Click to get started!


In this Document
Purpose
Questions and Answers
 Question 1: What allows the resource to offload in PS if 'Allow Offloading' field in the Work Order 'Bill of Resources' is set to 'No' via Integration?
 Question 2: How is %Utilization from EBS setup considered for runtime calculation for a resource in PS?
 Question 3: How does PS determine to offload to an alternate resource?
 Question 4: How does CRO solver treat Offloading?
 Question 5: What does "Upstream Operation Buffering" in resource properties -> Solver options do?
 Question 6: How does PS schedule on Batchable vs Multi-Capacity resources?
 Question 7: Dynamic Throughput calculation is not considered & operation run time is not correct, why?
 Question 8: Does the User Defined Ideal Sequence feature work without Campaign Run Optimization?
 Question 9: Why users not able to re-sequence operations schedule outside "Resource Horizon Constraint"?
 Question 10: Is there a functionality in PS to limit total number of changeovers on a resource?
 Question 11: Why is PS not respecting downtime created by EAM work order and schedules operations overlapping the downtime?
 Question 12: Why PS doesn't allow users to re-sequence operations scheduled on a multi capacity resource?
 Question 13: What is the impact to use "Relax Minimum and Maximum" constraints on item resources?
 Question 14: Is changeover supported on multi-capacity resources?
 Question 15: Run Time value within Bill of Resources Tab is not updated/changed for a Work Order Operation, when the Actual Resource is different than the Planned Resource. Why?
 Question 16: Why does PS schedule a work order outside the planning horizon even when sufficient resource capacity is available on all resources inside the planning horizon?
 Question 17: How to setup and user operation overlap in EBS-PS integration?
 Question 18: Is there an option in PS to setup throughput for a assembly line?
 Question 19: How to schedule work orders for an item on a resource with same attributes in the increasing order of work order quantities?
 Question 20: Is it possible to schedule multiple instances of a multi-capacity resource in PS using schedule by instance option in EBS?
 Question 21: What are the steps required to move a firm work order on a model?
 Question 22:  Why PS HTML Dispatch reports are not printing the breakdown hours on Resources? 
 Question 24: How does PS sort resources in Gantt view?
 Question 25: Why does PS display delay time event for past due date buckets when past due supplies days are included in PS plan options?