MRP Does Not Plan For Safety Stock Even When The 'Plan Safety Stock' Option Is Enabled
(Doc ID 1996668.1)
Last updated on JANUARY 23, 2023
Applies to:
Oracle Materials Requirement Planning - Version 12.1.3 and laterInformation in this document applies to any platform.
Symptoms
On : 12.1.3 version, Materials Requirements Plan.
ACTUAL BEHAVIOR
---------------
MRP does not plan for safety stock even when 'Plan Safety stock' is checked in the Plan Options
We can see safety stock shown in the horizontal plan.
But the projected available balance does not cover safety stock.
EXPECTED BEHAVIOR
-----------------------
Expect MRP Plan to consider Item Safety Stock. The projected available balance should cover safety stock
STEPS
-----------------------
The issue can be reproduced at will with the following steps:
1. Manufacturing and Distribution Responsibility
2. Nav: Material Planning -> MRP -> Names -> Options
3. Enable the Plan Safety Stock option
4. Nav: Material Planning -> MRP -> Launch
Run MRP Plan
5. Nav: Material Planning -> MRP -> Workbench
View results in the MRP Workbench
Cause