PMDA ICSR Validation error report will transmit via EMAIL
(Doc ID 2163229.1)
Last updated on JULY 13, 2023
Applies to:
Oracle Life Sciences Argus Safety Japan - Version 7.0.3 and laterInformation in this document applies to any platform.
Symptoms
When transmitting the PMDA paper report via Email, PMDA ICSR validation report was transmitted instead of the actual PMDA Paper report.
Conditions:
- This is a blind study case
- PMDA Paper report has been scheduled with the "Blind Study product" flag
- PMDA ICSR validation occurs when generating the final report first time.
Steps to reproduce:
1. Open the blind study case
2. Go to the regulatory report tab
3. Schedule PMDA paper report with "Blind study product" flag
4. Save and Lock the case
5. Click the final link of PMDA paper report
6. PMDA ICSR validation error report (PDF file) appears
7. Unlock the case
8. Fixed the data
9. Save the case
10. Lock the case
11. Click the final link of the PMDA paper report
12. PMDA Paper report was displayed and generated properly without any error
13. Save the case
14.Send the report via Email
15. Check the received email and open the attached PDF File
This is the PMDA validation report that was displayed at step6. The generated final report at step12 supposed to attache the email.
Changes
Cause
To view full details, sign in with your My Oracle Support account. |
|
Don't have a My Oracle Support account? Click to get started! |
In this Document
Symptoms |
Changes |
Cause |
Solution |
References |