EDD - Constrained Without Detailed Scheduling Plan Fails In Memory Based Planner with Infeasible!! and Program exited with status 1
(Doc ID 2419581.1)
Last updated on SEPTEMBER 24, 2024
Applies to:
Oracle Advanced Supply Chain Planning - Version 12.2.4 and laterInformation in this document applies to any platform.
Symptoms
On : 12.2.4 version, Constrained plan in PROD:
Users are on 12.2.4 and have applied VCP Cum Patch 12.2.4.1 - 19549533 - They are using 64 bit Linux for MBP and Snapshot. They are using the following file versions from one off patch 27137192
MSONWL64.ppc 120.15.12020000.58.1220402.6
MSCNPL64.ppc 120.11.12020000.11.1202040.34
Please note users have many beta fixes in Test but they are NOT in PROD at this time so the patching level above should be what they are currently using in PROD
Key profiles
MSO: Simplex Feasibility Tolerance is NULL
MSO: Simplex Optimality Tolerance is NULL
Users are running an EDD Constrained without detailed scheduling plan - it is an MPS/Production type plan. However it is failing in MSONWL64 module: Memory Based Planner 64-bit Linux fails in just under 4 minutes with the following error
ERROR
-----------------------
EnfDmdDueD
Constrained
GP maxPriority: 64
Timer Length=-1 Firstrunrepeat=1
advtype[0] = 0
usewhichgp = 1
Solving UnmetFirmWOPO Penalty Objective
NUMTHREADS = 1
presolve indicator: 1
adv start indicator: 0
infeasible!!
Solve LP t = 7 seconds.
Successfully solved lp0
zzz Objective = 0.00000000000000000000e+00
/u11/home/vcpprd/fs2/EBSapps/appl/mso/12.0.0/bin/MSONWL64.exe
Program exited with status 1
STEPS
-----------------------
The issue can be reproduced at will with the following steps:
1. Run Edd constrained without detailed scheduling plan
2. Plan fails in MSONWL64 with status 1
Cause
To view full details, sign in with your My Oracle Support account. |
|
Don't have a My Oracle Support account? Click to get started! |
In this Document
Symptoms |
Cause |
Solution |
References |