ACTUAL BEHAVIOR
A cost loading report is not forecasting based on remaining balance.
EXPECTED BEHAVIOR
The report shows the remaining balance correctly.
STEPS
The issue can be reproduced at will with the following steps:
- Run the cost loading report in BIP.
- Note the remaining costs shown in the report do not match P6 and are not spread out across each month.
Changes
Cause