How To Schedule Integration For Daylight Savings?
(Doc ID 2936771.1)
Last updated on MARCH 21, 2023
Applies to:
Oracle Integration-OIC - Version 18.2.5 and laterInformation in this document applies to any platform.
Goal
How to schedule integration for daylight savings?
The requirement was to schedule an integration to run at 6:30 AM Central Time (CT).
To maintain consistency through all the systems, the CT time was converted to UTC, and the integration was scheduled in UTC, i.e. to run the OIC integration at 6:30 AM CT, it was scheduled for 12:30 PM UTC.
However, when daylight savings time occurred, the integration which was supposed to run at 6:30 AM CT, actually ran at 7:30 AM CT.
Ideally, integration should have adjusted for daylight savings time automatically.
Solution