Troubleshooting Capital Projects in Oracle Projects Costing
(Doc ID 1578020.1)
Last updated on SEPTEMBER 13, 2024
Applies to:
Oracle Project Costing - Version 11.5.10.2 and laterInformation in this document applies to any platform.
Purpose
This note is created to troubleshoot the basic issues in capital project flow, it also contains most common scenarios which can be fixed by following the steps mentioned against particular scenario.
Troubleshooting Steps
To view full details, sign in with your My Oracle Support account. |
|
Don't have a My Oracle Support account? Click to get started! |
In this Document
Purpose |
Troubleshooting Steps |
Generate Asset Lines |
Asset lines not created for all assets and eligible transactions |
Regeneration of Un-Assigned Asset Lines Even After Assigning The Assets |
Capital Project Costs Are Being Categorized/Charged Under Expense Instead of CIP |
PA-FA Integration |
Asset Not Created in Oracle Assets |
Asset is Not Adjustable |
Original Asset Not Posted |
PRC: Interface Assets to Oracle Assets Does Not Enter Lines As Merged |
Tie-Back Process is Not Stamping FA Period Name and Asset Number Back To Projects |
PA-OAT Integration |
Expenditure Items Coming From Supplier Cost Items Tracked in Install Base, Are Improperly Being Adjusted And Causing Discrepancy in Projects |
Corrections/Returns made on PO Receipts Linked To Serializable Asset Item Do Not Get Interfaced To Projects |
Trackable (Non-Serializable) Item, When Placed Multiple Times-in-Service, Leads To Creation of More Expenditure Items Than Intended in Projects, Causing Negative CIP |
Miscellaneous |
Incorrect CIP Cost Shown in Capital Projects Summary Screen |
Guidelines for support before logging a Bug |
References |